How US nuclear regulation works: NRC, Agreement States and 10 CFR Parts 20, 50, 52 and 53

Who regulates a reactor, a radioactive source or a national laboratory depends on the activity, the material, the facility and the federal authority that applies. This page maps the main laws and rules at an introductory level.

Study aid · free · no sign-up

Original study explanations with cited regulations and technical references. Check the sources before relying on a regulatory statement.

Laws and agencies

The Atomic Energy Act of 1954 is the foundation of civilian nuclear regulation. The Energy Reorganization Act of 1974 split the old Atomic Energy Commission, creating the Nuclear Regulatory Commission (operating from January 1975) for regulation, and the Energy Research and Development Administration, whose functions later passed to the Department of Energy. The Price-Anderson provisions of the Atomic Energy Act, first enacted in 1957, set up a framework of insurance, industry-wide financial protection and limits on liability for compensating the public after a nuclear incident.

Under Section 274 of the Atomic Energy Act, most states have become Agreement States that license the possession and use of certain radioactive materials, including the sources in industrial gauges and medical uses. The NRC keeps authority over commercial power reactors everywhere, so a commercial SMR is licensed by the NRC, not by a state; reactors built for DOE or the military can fall under different federal authority. DOE regulates occupational radiation protection at most of its own facilities under Title 10 of the Code of Federal Regulations (10 CFR) Part 835. Worker protection rules under NRC licenses are in 10 CFR Part 19 (notices, instructions, worker rights) and Part 20 (dose limits and radiation protection programs).

Licensing reactors: Parts 50, 52 and 53

Under 10 CFR Part 50, a plant receives a construction permit and later an operating license. Part 52 offers five instruments: early site permits; standard design certifications, issued by rule (like NuScale's Appendix G); standard design approvals; manufacturing licenses; and combined licenses.

A combined license authorizes construction and conditionally authorizes operation of a nuclear power plant. Before operation begins, the NRC must find that the acceptance criteria for the required inspections, tests and analyses have been met (10 CFR 52.103(g)), and the licensee must satisfy the license conditions. For light-water reactors, NRC staff review applications against guidance such as NUREG-0800, the Standard Review Plan; other technologies may need different or supplemental guidance. Regulations set requirements, while guidance describes acceptable ways to meet them.

The Nuclear Energy Innovation and Modernization Act (NEIMA) of 2019 directed the NRC to build a technology-inclusive framework for advanced reactors. The resulting 10 CFR Part 53 final rule was published on March 30, 2026 and took effect on April 29, 2026. It is voluntary and risk-informed: applicants may use it or stay with Parts 50 and 52.

More in this topic

Frequently asked questions

Who licenses small modular reactors in the US?
For commercial SMRs, the Nuclear Regulatory Commission, under 10 CFR Part 50, Part 52 or, optionally, the new Part 53. Agreement States do not license power reactors.
What is 10 CFR Part 53?
An optional, risk-informed, performance-based and technology-inclusive licensing framework for commercial nuclear plants, published as a final rule in March 2026 in response to NEIMA.
What is an Agreement State?
A state that has taken over regulatory authority from the NRC for certain radioactive materials and activities under Section 274 of the Atomic Energy Act.
What is a combined license?
A Part 52 license that authorizes construction and conditionally authorizes operation of a nuclear power plant. Before operation begins, the NRC must find that the acceptance criteria for the required inspections, tests and analyses have been met, and the licensee must satisfy the license conditions. It often references a certified design; a design approval or certification alone does not authorize building or operating a plant.

Sources

  1. Atomic Energy Act of 1954, as amended (42 U.S.C. 2011 et seq.)
  2. NUREG-1350, Volume 35, NRC Information Digest, 2024–2025 www.nrc.gov
  3. 10 CFR Part 50, Domestic Licensing of Production and Utilization Facilities (U.S. NRC) www.ecfr.gov
  4. 10 CFR Part 52, Licenses, Certifications, and Approvals for Nuclear Power Plants (U.S. NRC) www.ecfr.gov
  5. U.S. NRC final rule, Risk-Informed, Technology-Inclusive Regulatory Framework for Advanced Reactors (10 CFR Part 53), Federal Register 2026-06048 www.federalregister.gov
  6. Nuclear Energy Innovation and Modernization Act (NEIMA), Pub. L. 115-439
  7. U.S. NRC final rule, NuScale Small Modular Reactor Design Certification, Federal Register 2023-00729 www.federalregister.gov
  8. NUREG-0800, Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR Edition (U.S. NRC) www.nrc.gov
  9. 10 CFR Part 19, Notices, Instructions and Reports to Workers: Inspection and Investigations (U.S. NRC) www.ecfr.gov
  10. 10 CFR Part 20, Standards for Protection Against Radiation (U.S. NRC) www.ecfr.gov
  11. 10 CFR Part 835, Occupational Radiation Protection (U.S. DOE) www.ecfr.gov